Neopatch or therion, 1 sq cm
This code is not in the latest file (4Q26). It was last listed in 3Q23.
Payment limit per 1 SQ CM, by effective quarter, 1Q23 to 3Q23. Gaps mean the code was not in that quarter’s file, or CMS gave no payment limit.This code is not in the latest file (4Q26). It was last listed in 3Q23.
Payment limit per 1 SQ CM, by effective quarter, 1Q23 to 3Q23. Gaps mean the code was not in that quarter’s file, or CMS gave no payment limit.No NDCs mapped to this code in the 4Q26 crosswalk.
| Quarter | Payment limit | Change | Billing unit | Description | Source file |
|---|---|---|---|---|---|
| 3Q23 | $65.919 | −$50.609 | 1 SQ CM | Neopatch or therion, 1 sq cm | v1, posted June 5, 2024 |
| 2Q23 | $116.528 | −$13.091 | 1 SQ CM | Neopatch or therion, 1 sq cm | v1, posted February 23, 2024 |
| 1Q23 | $129.619 | – | 1 SQ CM | Neopatch or therion, 1 sq cm | v1, posted December 6, 2023 |
“Change” is the difference from the previous quarter, shown only when both quarters have a payment limit and the billing unit is the same. “vs. last quarter” and “vs. a year ago” follow the same rule.