Architect ecm px fx 1 sq cm
This code is not in the latest file (4Q26). It was last listed in 4Q24.
Payment limit per 1 SQ CM, by effective quarter, 4Q23 to 4Q24. Gaps mean the code was not in that quarter’s file, or CMS gave no payment limit.This code is not in the latest file (4Q26). It was last listed in 4Q24.
Payment limit per 1 SQ CM, by effective quarter, 4Q23 to 4Q24. Gaps mean the code was not in that quarter’s file, or CMS gave no payment limit.No NDCs mapped to this code in the 4Q26 crosswalk.
| Quarter | Payment limit | Change | Billing unit | Description | Source file |
|---|---|---|---|---|---|
| 4Q24 | $147.222 | $0.00 | 1 SQ CM | Architect ecm px fx 1 sq cm | v1, posted June 11, 2025 |
| 3Q24 | $147.222 | $0.00 | 1 SQ CM | Architect ecm px fx 1 sq cm | v1, posted June 11, 2025 |
| 2Q24 | $147.222 | $0.00 | 1 SQ CM | Architect ecm px fx 1 sq cm | v1, posted March 11, 2025 |
| 1Q24 | $147.222 | +$35.333 | 1 SQ CM | Architect ecm px fx 1 sq cm | v1, posted December 19, 2024 |
| 4Q23 | $111.889 | – | 1 SQ CM | Architect ecm px fx 1 sq cm | v1, posted October 10, 2024 |
“Change” is the difference from the previous quarter, shown only when both quarters have a payment limit and the billing unit is the same. “vs. last quarter” and “vs. a year ago” follow the same rule.